Home/Permits
How a Mississippi On-Site Permit Actually Works
Nothing in this process is optional, and nothing in it is quick.
the Mississippi State Department of Health is the permitting authority statewide through its Division of On-Site Wastewater, so there is no county office writing its own rules here. The rules it applies are Title 15, Part 3, Subpart 77, administered by the Mississippi State Department of Health.
The four things that go wrong
-
The Notice of Intent comes before the house, not after
Rule 1.4.1 puts it before constructing or placing any residence that might need a system. Do it the other way round on Yazoo clay and you can end up with a house on a lot that will not take a conventional system anywhere.
-
The Permit/Recommendation IS the approved plan
It lists the system options you are allowed to install. Install something that is not on it and the final approval does not come.
-
Buying a house on septic can trigger a connection event
Rule 1.2.2 counts a change in the water-utility-responsible party on a property whose ownership has changed as a connection, the same as setting a meter on a new build.
-
Do not read the neighbour system as evidence
Yazoo clay is patchy. The depth to it can change across a single lot, let alone across a street. A conventional field working two doors down tells you nothing about what your own boring will find.
Who to contact
the Mississippi State Department of Health
1-855-220-0192
We are not affiliated with them. Verify anything on this page against their own current documents before you act on it.
A licensed site evaluator has to answer that with a soil test; nobody can tell from a map. Send us your address and we will have local licensed pros quote the evaluation and the install. Request free quotes →